Production / Equipment for oil terminals /

Top Loading Arm for Liquefied Gases - E2611 E2612

Top Loading Arm for Liquefied Gases - E2611 E2612

Top Loading Arm for Liquefied Gases - E2611 E2612

The E2611 E2612 Top Loading Arms are especially designed for the loading and unloading of liquefied gases.

The arm is connected to the rail car compartment by a coupler, especially designed for Russian railcars. The coupler provides a fast and safe connection to the valves of the rail car.

The E2612 Loading Arm is combined with a second recommended Vapor Arm E2611.

This loading arm is designed with two end pipes for unloading. A gas return arm with one end pipe allows another use of unloading the rail car under pressure.

The robust and high quality design of the swivel joints and the spring cylinder balancing provides comfortable and smooth handling of the arm.

The E2611 presents an economic and successful solution for selected applications of loading and unloading liquefied hydrocarbon gases.

In distinction to hoses the piping provides safety from explosion, driveway obstructions and condensate losses at site.

Sizes: DN 40, DN 50, DN 80, DN 100

Materials: Carbon steel, Stainless steel

Seal materials: PTFE, Special materials

Allowable temperature range: -57°C to +110°C

Alternative dimensions and materials available on request.